For over 20 years, we have been successfully creating and developing solutions for modern construction and spatial planning. Our experience and expertise allow us to effectively support architects, designers, contractors, and developers in selecting the right products. If you need assistance, additional information, or would like to learn more about our offerings, please feel free to contact us. We’ll be happy to answer your questions and help you choose the best solution.
Most common mistakes when installing ecogrids and how to avoid them
Even a high-quality paving system may not meet expectations if fundamental installation errors are made. In practice, most problems do not stem from the product itself, but from improper substrate preparation and rushing during work.
Mistake 1. Insufficient Sub-base
This is the most common cause of surface subsidence and rutting. The sub-base structure must be adapted to the intended use.
Mistake 2. Lack of Proper Compaction
Even well-chosen layers will not fulfill their role if they are not properly compacted. This is a step that must not be skipped.
Mistake 3. Incorrectly Chosen Filling Material
The type of filling material should correspond to the purpose of the surface. A green area requires different solutions than a heavily used driveway.
Mistake 4. Lack of Level and Slope Control
An improperly leveled surface looks unsightly and can cause water drainage problems.
Mistake 5. Mismatching the Product to the Application
Every surface has different requirements. The choice of system should take into account real loads and operating conditions.
How to avoid problems?
The best way is to:
- properly plan the investment,
- select the system according to the surface’s function,
- carefully construct the sub-base,
- pay attention to installation details,
- use proven solutions.
Summary
The durability of a surface is determined during the preparation phase. The better the implementation is planned, the better the final result and the lower the risk of costly corrections.
FAQ
Can installation errors be corrected?
Some can, but it often involves additional costs and the need to dismantle part of the surface.
Is the product itself the most important factor?
No. The design, sub-base, and quality of execution are equally important.
Is it worth saving on execution?
Apparent savings often lead to the need for quick repairs.
